MARKET OPEN

Theme · Power Generation

The bottleneck the market discovered late.

Data center capex went vertical in 2024 and the grid couldn't keep up. Independent power producers (Vistra, Constellation) sold out their dispatchable generation to hyperscalers. NextEra is the largest renewables operator at the scale AI demands. GE Vernova builds the gas turbines that bridge the gap. SMR plays (NuScale, Oklo) are the speculative tail. Power is increasingly the rate-limiter on model training, not silicon.

Power Generation · 1d avg

-3.29%

7 tickers tracked

Signals (three independent reads)

What the canon says
  • “By 2028, training a single frontier model will require more electricity than several US states consume.”

    Aschenbrenner · structural

Parallel readings, not a composite score. Composite scoring lands in v3 once each signal validates against subsequent moves.

Constituents · ranked by today’s perf

Power Generation · 7 constituents

TickerPrice1d30d
$NEE$84.77+0.95%
$CEG$245.22-2.58%
$VST$120.38-2.82%
$SMR$3.42-3.12%
$ETN$321.30-4.47%
$GEV$717.82-5.14%
$OKLO$19.55-5.87%

News in this theme

Reuters · 9h ago

bullish

NextEra expands manufacturing capacity by 40%

The capex package committed this morning takes NEE capacity up materially through 2027. The signal: management sees the demand curve flatter for longer than the consensus model.

Top fund exposures to Power Generation

Funds holding the most of this theme

FundPositions% of portfolio
Coatue ManagementAI-heavy hedge fund. Semis + hyperscaler exposure.99.4%
Tiger Global ManagementMega-cap AI conviction. Public + private crossover.12.7%
Whale Rock CapitalAI + robotics conviction. Tesla, NVIDIA, Meta core.40.4%
Baillie GiffordLong-duration tech. Early NVDA and Tesla holder.30.4%
Maverick CapitalTech long/short. Tiger Cub lineage, concentrated AI positions.10.0%
Constituents drawn from the Bluechip Power Generation universe. Fund exposures derived from 13F filings.@BluechipsAI·November 24, 2026